Oberbeton, a reinforced concrete structures production plant

Stage: executed project
Segment: industrial construction
Services: general contract for construction
Location: Zhytomyr region, Zhytomir, 89, Baranova Str.
Period of construction: 2008 – 2009
The plant was commissioned in the second half of 2009.
Land area: 14.4 hectares
Built-up area: 2.7 hectares
Area: 30 000 m2

Production:
- hollowcore boards, 450 000 m2/year;
- stay-in-place formwork Filigran,
200 000 m2/year;
- prestressed beams and columns,  42 500 m3/year

 

 

 
News
May 16, 2012
Opening of international airport "Lviv" was attended by the President of Ukraine Viktor Yanukovych and the president of UEFA Michel Platini.
April 12, 2012
Business Directions